Hudson RCI Hudson RCI
20,000 square foot clean room project - Arlington Heights, IL

Scope includes design build consulting, construction management and general contracting.

  • Budget – $3.2M
  • Project Duration – 18 months phased occupied build out. Clean room remained in production during the entire construction project.
  • Direct over site of the entire project from conception to completion.
  • Architect - Studio 3
  • MEP’s - Design Build Mechanical Team
Teleflex Medical Teleflex Medical
Reverse osmosis water treatment plant

Scope includes design-build consulting, construction management and general contracting.

  • Budget - $5.4M
  • Project Duration – 2 weeks
  • Direct coordination with G.E. Manufacturing and Install
  • Architect- Studio 3

«« Back to Portfolio

 

Home   |   About Us   |   Construction Solutions   |   Project Portfolio   |   Team Members   |   Contact Us

©2010 Catalyst GC & Development, Inc. All rights reserved.
EMPLOYEE LOGIN  |  FTP SITE  |  SITE MAP  |  PRIVACY POLICY
 
Website Design & Development by
Digital Affinity, Inc. - Website Design & Development