Project Portfolio: Manufacturing / Distribution
«« Back to Portfolio
 |
 |
20,000 square foot clean room project - Arlington Heights, IL
Scope includes design build consulting, construction management and general contracting.
- Budget $3.2M
- Project Duration 18 months phased occupied build out. Clean room remained in production during the entire construction project.
- Direct over site of the entire project from conception to completion.
- Architect - Studio 3
- MEPs - Design Build Mechanical Team
|
 |
 |
 |
Addition and site improvements Chicago, IL
Scope included design-build consulting, construction management and general contracting.
- Budget - $200K
- Size 1,600 sf
- Project Duration 3 months
- Architect Perry and Associates
|
 |
 |
 |
Premier source of organic foods in the Midwest Chicago, IL
Catalyst Construction Group, Inc. recently completed numerous projects of an occupied
distribution center including but not limited their entrances, railings, dock doors, and
life safety solutions for their distribution center. Scope includes general contracting.
Project Team:
General Contractor Catalyst Construction Group, Inc.
Owner - Goodness Greenness Inc
|
 |
 |
 |
Reverse osmosis water treatment plant
Scope includes design-build consulting, construction management and general contracting.
- Budget - $5.4M
- Project Duration 2 weeks
- Direct coordination with G.E. Manufacturing and Install
- Architect- Studio 3
|